PERMIT FOR WORK WITHIN THE AREA OF CONTROL
The term "Area of Control" means the waterways within the district where the estimated peak flow at any given point is 20% or greater than the total estimated peak flow of the entire reach.
The Area of Control Map above is color code to identify which of the three set backs are in a given area.
Work within the Area of Control requires a permit and includes: any channel change, encroachment, filling, grading, excavating, or construction of any structure.
RIGHT CLICK on the correct permit and choose
"Open in new window" to view and/or print a permit.
Blue - Area of Control is 75' of the Stream Bank
Permit for work within the Area of Control 75'
Green - Area of Control is 50' of the Stream Bank
Permit for work within the Area of Control 50'
Purple - Area of Control is 30' of the Stream Bank
Permit for work within the Area of Control 30'